Link to homepage

Iceland Frozen Foods


Frozen Distribution Centres 
Client – Iceland Foods 
Construction Cost – total of over £80m 

Several projects for Iceland Foods throughout the UK, totalling over 400,000ft2.

-      
Warrington – installation of a new 45,000ft2 cool box within existing distribution centre (£2.4m)
-       Livingston – new build 60,000ft2 extension to existing distribution centre (£5m)
-       Enfield – new build high bay 250,000ft2 distribution centre (£16m)
-       Swindon – new build high bay 285,000ft2 distribution centre (£22m)
-       Cold Stores Darlaston & Barnsley – two projects each of 90,000ft2 and cost of £7m

Back to